Company:Pangang Group Chongqing Titanium Industry Co. Ltd
Commissioning Date:Sep, 2016
The waste heat recovery system of 300kt/a sulfuric acid plant for Pangang Group Chongqing Titanium Industry Co. Ltd was put into operation in September 2016,the system was concurrently built with the main system which has no 1st absorption tower.The low temperature heat absorption tower features double section absorption with demister located on top.
Address:Park Hing Road, Baoshan District, Shanghai 1986 Floor 021-36586566
Copyright © 2018 ALLGREEN ENVIRONMENTAL ENGINEERING CO.,LT All Rights Reserved.